A study of preassembly and packaging of SM-2 plant equipment was undertaken to develop an SM-2 final design with minimum field erection, reduction in over-all construction costs, and provisions for dismantling equipment after a period of operation. Equipment sizes are based on utilization of a 28 Mw(th) pressurized water reactor and a 7500 kw turbo-generator. Drawings showing the arrangement of equipment on skids and the over-all plant layout are provided. Studies and surveys for primary shielding are included, as are equipment evaluations and a cost evaluation of a packaged plant versus a field erected plant. (auth)
Research Organization:
Alco Products, Inc., Schenectady, N.Y.
NSA Number:
NSA-14-016436
OSTI ID:
4164293
Report Number(s):
APAE-60
Country of Publication:
United States
Language:
English

Similar Records

SM-2 6000 eKW (NET) NUCLEAR POWER PLANT FINAL DESIGN SECONDARY SYSTEM
Technical Report · Thu Jun 01 00:00:00 EDT 1961 · OSTI ID:4026278

SM-2 12000 eKW POWER COMPLEX NUCLEAR POWER PLANT SECONDARY SYSTEM DESIGN
Technical Report · Thu Jun 01 00:00:00 EDT 1961 · OSTI ID:4026277

Packaged sulfur plants built on skids, shipped to site
Journal Article · Mon Mar 31 23:00:00 EST 1969 · Petro/Chem Eng.; (United States) · OSTI ID:5375274