A study of preassembly and packaging of SM-2 plant equipment was undertaken to develop an SM-2 final design with minimum field erection, reduction in over-all construction costs, and provisions for dismantling equipment after a period of operation. Equipment sizes are based on utilization of a 28 Mw(th) pressurized water reactor and a 7500 kw turbo-generator. Drawings showing the arrangement of equipment on skids and the over-all plant layout are provided. Studies and surveys for primary shielding are included, as are equipment evaluations and a cost evaluation of a packaged plant versus a field erected plant. (auth)
- Research Organization:
- Alco Products, Inc., Schenectady, N.Y.
- NSA Number:
- NSA-14-016436
- OSTI ID:
- 4164293
- Report Number(s):
- APAE-60
- Country of Publication:
- United States
- Language:
- English
Similar Records
SM-2 6000 eKW (NET) NUCLEAR POWER PLANT FINAL DESIGN SECONDARY SYSTEM
SM-2 12000 eKW POWER COMPLEX NUCLEAR POWER PLANT SECONDARY SYSTEM DESIGN
Packaged sulfur plants built on skids, shipped to site
Technical Report
·
Thu Jun 01 00:00:00 EDT 1961
·
OSTI ID:4026278
SM-2 12000 eKW POWER COMPLEX NUCLEAR POWER PLANT SECONDARY SYSTEM DESIGN
Technical Report
·
Thu Jun 01 00:00:00 EDT 1961
·
OSTI ID:4026277
Packaged sulfur plants built on skids, shipped to site
Journal Article
·
Mon Mar 31 23:00:00 EST 1969
· Petro/Chem Eng.; (United States)
·
OSTI ID:5375274