Organizational, design, and functional modifications to the proposed reactor facility at Texas A. and M. are described. Authorization to operate the reactor at an initial 100 kw power level and provisional authorization to operate at a full power of 5 Mw is sought. An addition to the site of a high-level gamma irradiation facility is proposed. The reactor pool, originally proposed as two sections, was elongated to provide a third section, which will be used for future expansion. In addition to the originally requested 0.7%, 1.0% excess reactivity is requested for 100 kw operation. The philosophy of controls and instrumentation was altered to eliminate much of the complex interlock system originally proposed. The reactor building was modified to raise the height of the roof 15 ft. It was concluded that neither primary coolant pump failure nor municipal power failure would lead to any significant problems or to any potential radiation hazard. Operation and emergency procedures are outlined. (M.C.G.)
- Research Organization:
- Texas. Agricultrral and Mechanical Coll., College Station
- NSA Number:
- NSA-15-025046
- OSTI ID:
- 4021040
- Report Number(s):
- FZK-110(Suppl.1)
- Country of Publication:
- Country unknown/Code not available
- Language:
- English
Similar Records
PROPOSED EXTENSION OF THE NAVAL RESEARCH LABORATORY RESEARCH REACTOR OPERATING SCHEDULE TO MORE THAN 40 HOURS PER WEEK
A HAZARDS SUMMARY OF THE PROPOSED RESEARCH AND TRAINING REACTOR
HAZARDS SUMMARY REPORT FOR THE NUCLEAR SCIENCE CENTER
Technical Report
·
Tue May 12 00:00:00 EDT 1959
·
OSTI ID:4235414
A HAZARDS SUMMARY OF THE PROPOSED RESEARCH AND TRAINING REACTOR
Technical Report
·
Sat Dec 31 23:00:00 EST 1955
·
OSTI ID:4335000
HAZARDS SUMMARY REPORT FOR THE NUCLEAR SCIENCE CENTER
Technical Report
·
Sat Feb 28 23:00:00 EST 1959
·
OSTI ID:4237284