ROD DROP TESTS FOR THE BSR-II TRANSIENT AND CONTROL RODS
Technical Report
·
OSTI ID:4019210
Rod displacement was measured as a function of time for both the control and transient rods in the spring-accelerated modular control-rod drive for the Bulk Shielding Reactor II (BSR-II). The measurements were performed by dropping the rods from heights ranging from 1 to 12 in. above the seat position. A composite displacement curve was drawn for all BSR-II spring-loaded control rods. (D.L.C.)
- Research Organization:
- Oak Ridge National Lab., Tenn.
- DOE Contract Number:
- W-7405-ENG-26
- NSA Number:
- NSA-15-017860
- OSTI ID:
- 4019210
- Report Number(s):
- CF-61-3-40
- Country of Publication:
- United States
- Language:
- English
Similar Records
TRANSIENT TESTS OF THE BSR-II CORE IN THE SPERT I FACILITY
SAFEGUARD REPORT FOR A STAINLESS STEEL RESEARCH REACTOR FOR THE BSF (BSR- II)
Evidence of fast non-linear feedback in EBR-II rod-drop measurements
Technical Report
·
Sun Mar 31 23:00:00 EST 1963
·
OSTI ID:4681360
SAFEGUARD REPORT FOR A STAINLESS STEEL RESEARCH REACTOR FOR THE BSF (BSR- II)
Technical Report
·
Mon Aug 11 00:00:00 EDT 1958
·
OSTI ID:4330849
Evidence of fast non-linear feedback in EBR-II rod-drop measurements
Conference
·
Mon Jun 01 00:00:00 EDT 1987
·
OSTI ID:6259082