Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Large diameter, deep water pipelay Zeepipe IIA project

Conference ·
OSTI ID:400952
; ;  [1]
  1. European Marine Contractors Ltd., Motspur Park (United Kingdom)

The 300 km Zeepipe IIA offshore gas pipeline was installed by European marine Contractors Ltd. for Statoil between the Sleipner A Platform and the Kollsness Terminal tunnel exit in the 1994 and 1995 lay seasons. The route passes through the Norwegian Trench and the highly undulating nearshore area at Oygarden. While smaller pipes have been laid in deeper water, with a diameter of 40 inches and a maximum water depth of 365 meters this pipeline represents the most technically demanding combination of diameter and water depth laid in the world to date. The project faced specific challenges, including high lay tensions, heavily concrete coated pipe, pipeline laydown and recovery in deep water, subsea pockmark and boulder fields, stringent lay tolerances and low residual tension requirements. This paper details the planning, installation engineering, equipment modification and innovations required to achieve successful completion of the pipeline installation.

OSTI ID:
400952
Report Number(s):
CONF-9606279--; ISBN 0-7918-1494-7
Country of Publication:
United States
Language:
English

Similar Records

Norway's Zeepipe project means more gas for Europe
Journal Article · Sat Aug 01 00:00:00 EDT 1992 · Pipeline and Gas Journal; (United States) · OSTI ID:7025970

Subsea connection template will ease future Zeepipe expansion
Journal Article · Mon May 03 00:00:00 EDT 1993 · Oil and Gas Journal; (United States) · OSTI ID:6487915

Zeepipe project set to jump off
Journal Article · Mon Jun 27 00:00:00 EDT 1988 · Oil Gas J.; (United States) · OSTI ID:7121048