Final proposed plan, Army Materials Technology Laboratory, task order 1, remedial investigation/feasibility study
The U.S. Army is proposing a cleanup plan, referred to as a preferred alternative, to address outdoor contamination at the MTL Superfund site in Watertown, Massachusetts. The Proposed Plan recommends one of the cleanup options from among those that were evaluated during the Remedial Investigation (RI) and Feasibility Study (FS) performed for the site. The Army is publishing this Proposed Plan to provide opportunity for public review and comment on the cleanup alternatives, known as remedial alternatives, under consideration for the site. The Army is soliciting comments on the proposed level of cleanup and will consider public comments as part of the final decision-making process for selecting the cleanup remedy for the site.
- Research Organization:
- Weston (Roy F.), Inc., West Chester, PA (United States)
- OSTI ID:
- 381646
- Report Number(s):
- AD-A--311077/2/XAB; CNN: Contract DAAA15-90-D-0009
- Country of Publication:
- United States
- Language:
- English
Similar Records
Superfund record of decision (EPA Region 1): Materials Technology Laboratory Site, (US Army) soils and groundwater operable unit, Watertown, MA, September 26, 1996
Feasibility study report (outdoor) Army Materials Technology Laboratory. Volume 1. Technical. Final report 1990-January 1996