Teamwork: The methodology for successfully drilling the Judy/Joanne development
Conference
·
OSTI ID:372435
A non-integrated approach was used to manage development drilling of the Judy/Joanne field. Phillips Petroleum Company United Kingdom Limited (the Operator) elected to retain the role of project and operations coordinator. Others have felt it necessary to integrate the provision of drilling services to achieve operational effectiveness. The Operator approached the management of the operation on a more traditional tack but with the same goal. The management emphasis was on team building and ensuring each party`s contribution was optimized. The non-integrated approach to service provision enabled the Operator to maximize the value of in-house experience, to select the preferred suppliers based on safety and operational performance, and to maintain the leading role required of the lease holder. An incentive contract with the drilling contractor rewarded and penalized performance. It provided a win/win arrangement. Contracts with the third party companies were awarded on the basis of best for purpose. The non-integrated approach has proven cost effective and an operational success.
- OSTI ID:
- 372435
- Report Number(s):
- CONF-9410272--
- Country of Publication:
- United States
- Language:
- English
Similar Records
Operator and contractor benefit from incentive contracts
Phillips Seastar Project: A teamwork approach
Brief: J-Block template drilling: Innovation and teamwork break world records
Journal Article
·
Mon Sep 16 00:00:00 EDT 1991
· Oil and Gas Journal; (United States)
·
OSTI ID:5570723
Phillips Seastar Project: A teamwork approach
Conference
·
Mon Dec 30 23:00:00 EST 1996
·
OSTI ID:423156
Brief: J-Block template drilling: Innovation and teamwork break world records
Journal Article
·
Tue Jan 31 23:00:00 EST 1995
· JPT, Journal of Petroleum Technology
·
OSTI ID:31891