Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Brief: J-Block template drilling: Innovation and teamwork break world records

Journal Article · · JPT, Journal of Petroleum Technology
OSTI ID:31891
 [1]
  1. Phillips Petroleum U.K. Ltd., Aberdeen (United Kingdom)
Phillips Petroleum Co. U.K. Ltd. began template drilling on the Judy and Joanne fields in Block 30/7a (J-Block) in May 1993, and progress has been remarkable. After a template was set by a jackup drilling rig, two 70-in. holes were drilled for docking piles, which were run and cemented in place. Batch setting of nine conductors was completed within 12 days. Drilling then proceeded at unprecedented rates, including drilling a world record 8,631 ft of 12{1/4}-in. hole in 24 hours. This paper discusses the innovative engineering, design, cost-reduction, and teamwork philosophy that has seen the project progress ahead of schedule and significantly under budget.
OSTI ID:
31891
Journal Information:
JPT, Journal of Petroleum Technology, Journal Name: JPT, Journal of Petroleum Technology Journal Issue: 2 Vol. 47; ISSN 0149-2136; ISSN JPTJAM
Country of Publication:
United States
Language:
English

Similar Records

J-block template drilling: Innovation and teamwork break cost and time barriers
Conference · Fri Dec 30 23:00:00 EST 1994 · OSTI ID:382636

Teamwork: The methodology for successfully drilling the Judy/Joanne development
Conference · Fri Dec 30 23:00:00 EST 1994 · OSTI ID:372435

Drilling template acurately leveled with pile-supported system
Journal Article · Sun Dec 20 23:00:00 EST 1992 · Oil and Gas Journal; (United States) · OSTI ID:7009574