Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Preliminary safety evaluation, Project W-059, B Plant canyon ventilation upgrade

Technical Report ·
DOI:https://doi.org/10.2172/35349· OSTI ID:35349
This document provides a preliminary evaluation of the feasibility of the project W-059 conceptual design from a safety aspect. A preliminary list of safety related equipment is included.
Research Organization:
Westinghouse Hanford Co., Richland, WA (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-87RL10930
OSTI ID:
35349
Report Number(s):
WHC-SD-W059-PSE--002; ON: DE95008879
Country of Publication:
United States
Language:
English