Functional design criteria, Project W-059, B Plant Canyon ventilation upgrade
This document outlines the essential functions and requirements to be included in the design of the proposed B Plant canyon exhaust system upgrade. The project will provide a new exhaust air filter system and isolate the old filters from the airstream.
- Research Organization:
- Westinghouse Hanford Co., Richland, WA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC06-87RL10930
- OSTI ID:
- 10127804
- Report Number(s):
- WHC-SD-W059-FDC--002; ON: DE95008419; BR: 35AF11201/35AF11202
- Country of Publication:
- United States
- Language:
- English
Similar Records
Functions and requirements, B Plant canyon ventilation upgrade. Revision 1
Engineer/Constructor Management Plan B-Plant Canyon Ventilation Upgrade Project W-059
B Plant retired HEPA filters engineering study (Project W-059)
Technical Report
·
Thu Aug 18 00:00:00 EDT 1994
·
OSTI ID:10185745
Engineer/Constructor Management Plan B-Plant Canyon Ventilation Upgrade Project W-059
Technical Report
·
Thu Apr 27 00:00:00 EDT 1995
·
OSTI ID:69365
B Plant retired HEPA filters engineering study (Project W-059)
Technical Report
·
Mon Oct 31 23:00:00 EST 1994
·
OSTI ID:10191867