Acceptance test report MICON software exhaust fan control
This test procedure specifies instructions for acceptance testing of software for exhaust fan control under Project ESPT (Energy Savings Performance Contract). The software controls the operation of two emergency exhaust fans when there is a power failure. This report details the results of acceptance testing for the MICON software upgrades. One of the modifications is that only one of the emergency fans will operate at all times. If the operating fan shuts off or fails, the other fan will start and the operating fan will be stopped.
- Research Organization:
- Fluor Daniel Hanford, Inc., Richland, WA (United States)
- Sponsoring Organization:
- USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
- DOE Contract Number:
- AC06-96RL13200
- OSTI ID:
- 353314
- Report Number(s):
- HNF-2217; ON: DE99050718; BR: EW7002010; TRN: AHC29923%%146
- Resource Relation:
- Other Information: PBD: 12 Jun 1998
- Country of Publication:
- United States
- Language:
- English
Similar Records
Acceptance test procedure MICON software exhaust fan control modifications
Acceptance test report MICON software exhaust fan control modifications
Site acceptance test, W-030 MICON system
Technical Report
·
Fri May 21 00:00:00 EDT 1999
·
OSTI ID:353314
Acceptance test report MICON software exhaust fan control modifications
Technical Report
·
Thu May 20 00:00:00 EDT 1999
·
OSTI ID:353314
Site acceptance test, W-030 MICON system
Technical Report
·
Mon Jun 10 00:00:00 EDT 1996
·
OSTI ID:353314