Site acceptance test, W-030 MICON system
Monitoring and control of the W-030 ventilation upgrade is provided by a distributed control system (DCS) furnished by MICON Corporation. After shipment to the Hanford Site, the site acceptance test (SAT) for this system was conducted in a laboratory environment over a six month period, involving four distinct phases and numerous hardware and software modifications required to correct test exceptions. The final results is a system which is not fully compliant with procurement specifications but is determined to meet minimum Project W-030 safety and functional requirements. A negotiated settlement was reached with the supplier to establish a `path forward` for system implementation. This report documents the `as-run` status of the SAT. The SAT was completed in August of 1995. It was later followed by comprehensive acceptance testing of the W-030 control-logic configuration software; results are documented in WHC-SD-W030-ATR-011. Further testing is reported as part of process system startup operational testing, performed after the MICON installation.
- Research Organization:
- Westinghouse Hanford Co., Richland, WA (United States)
- Sponsoring Organization:
- USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
- DOE Contract Number:
- AC06-96RL13200
- OSTI ID:
- 662041
- Report Number(s):
- WHC-SD-W030-TRP-001; ON: DE98054209; BR: EW3130010; TRN: 96000460
- Resource Relation:
- Other Information: PBD: 10 Jun 1996
- Country of Publication:
- United States
- Language:
- English
Similar Records
Software Development Plan for the 241-AY and 241-AZ Tank Farm MICON automation system
Test report for run-in acceptance testing of hydrogen mitigation retrieval Pump-3