Feasibility study on transmission system and substation development project, third state (i-shaped area). Volume 2. Long term report (1994-2013). Export trade information
The study, conducted by Black & Veatch International, was funded by the U.S. Trade and Development agency on behalf of Thailand`s Provincial Electricity Authority (PEA). The purpose of the report is to identify both system impact and physical requirements to meet the anticipated increase in demand for PEA furnished electric energy in Thailand`s Southern Region. Presented is a technical, financial, and economic feasibility study resulting in planning reports of the 115 kV Electric Power Supply, and distribution Systems required to accommodate short and long term growth projections. This is the second of two volumes and it includes the Long Term Master Plan Feasibility Study. It is divided into the following sections: (1) Summary and Conclusions; (2) Introduction and Background; (3) Existing Study Area and Development; (4) Load Forecast; (5) Alternative Plans; (6) Technical Analysis; (7) General Economic Analysis; (8) Financial Analysis; (9) Appendices.
- Research Organization:
- Black and Veatch, Kansas City, MO (United States)
- OSTI ID:
- 35173
- Report Number(s):
- PB-95-187597/XAB; TRN: 50902415
- Resource Relation:
- Other Information: DN: This document was provided to NTIS by the U.S. Trade and Development Agency, Rosslyn, VA. See also Volume 1, PB--95-187449; PBD: 11 Nov 1994
- Country of Publication:
- United States
- Language:
- English
Similar Records
Feasibility study report for distribution dispatching center project 2nd stage for the Provincial Electricity Authority (PEA), Bangkok, Thailand, June 1998. Export trade information
Feasibility study for biomass power plants in Thailand. Volume 1. Main report. Export trade information