Feasibility study on transmission system and substation development project, third stage (i-shaped area). Volume 1. Short term report (1994-1998). Export trade information

Technical Report ·
OSTI ID:35171
Provincial Electricity Authority (PEA). The purpose of the report is to identify both system impact and physical requirements to meet the anticipated increase in demand for PEA furnished electric energy in Thailand`s Southern Region. Presented is a technical, financial, and economic feasibility study resulting in planning reports of the 115 kV Electric Power Supply, and Distribution Systems required to accommodate short and long term growth projections. This is the first of two volumes and it includes the First Five Year Feasibility Implementation Plan. It is divided into the following sections: (1) Summary and Conclusions; (2) Introduction and Background; (3) Existing Study Area; (4) Load Forecast; (5) Alternative Plans; (6) Technical Analysis; (7) Economic Analysis of Individual Subprojects; (8) Financial Analysis; (9) Implementation Plan; (10) Project Management; (11) Appendices.
Research Organization:
Black and Veatch, Kansas City, MO (United States)
OSTI ID:
35171
Report Number(s):
PB--95-187449/XAB
Country of Publication:
United States
Language:
English