Tank waste remediation system fiscal year 1998 multi-year work plan WBS 1.1
The TWRS Project Mission is to manage and immobilize for disposal the Hanford Site radioactive tank waste and cesium (Cs)/strontium (Sr) capsules in a safe, environmentally sound, and cost-effective manner. The scope includes all activities needed to (1) resolve safety issues; (2) operate, maintain, and upgrade the tank farms and supporting infrastructure; (3) characterize, retrieve, pretreat, and immobilize the waste for disposal and tank farm closure; and (4) use waste minimization and evaporation to manage tank waste volumes to ensure that the tank capacities of existing DSTs are not exceeded. The TWRS Project is responsible for closure of assigned operable units and D&D of TWRS facilities.
- Research Organization:
- Westinghouse Hanford Co., Richland, WA (United States)
- Sponsoring Organization:
- USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
- DOE Contract Number:
- AC06-96RL13200
- OSTI ID:
- 335150
- Report Number(s):
- HNF-SP--1230; ON: DE99050293; BR: EW3120075
- Country of Publication:
- United States
- Language:
- English
Similar Records
Tank waste remediation system fiscal year 1997 multi-year workplan WBS 1.1
Tank Waste Remediation System fiscal year 1996 multi-year program plan WBS 1.1. Revision 1, Appendix A
A systematic look at Tank Waste Remediation System privatization
Technical Report
·
Mon Sep 23 00:00:00 EDT 1996
·
OSTI ID:16774
Tank Waste Remediation System fiscal year 1996 multi-year program plan WBS 1.1. Revision 1, Appendix A
Technical Report
·
Fri Sep 01 00:00:00 EDT 1995
·
OSTI ID:137405
A systematic look at Tank Waste Remediation System privatization
Technical Report
·
Sun Dec 31 23:00:00 EST 1995
·
OSTI ID:244554