Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Acceptance test report for the safety class shutdown system

Technical Report ·
DOI:https://doi.org/10.2172/332189· OSTI ID:332189
This document provides the Acceptance Test Report for the successful testing of the Safety Shutdown Circuit. The test was done in accordance with the requirements that were defined in WHC-SD-WM-SCH-003, Interim Stabilization Safety Class Trip Circuit CGI Dedication Criteria. The actual test procedure document was contained in WHC-SD-WM-ATP-185, Acceptance Test Procedure for the Safety Class Shutdown System.
Research Organization:
Westinghouse Hanford Co., Richland, WA (United States)
Sponsoring Organization:
USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
DOE Contract Number:
AC06-96RL13200
OSTI ID:
332189
Report Number(s):
WHC-SD-WM-ATR--185; ON: DE98059024; BR: EW3120071
Country of Publication:
United States
Language:
English

Similar Records

Cone penetrometer moisture probe acceptance test report
Technical Report · Tue Apr 23 00:00:00 EDT 1996 · OSTI ID:362386

Cone penetrometer acceptance test report
Technical Report · Thu Sep 19 00:00:00 EDT 1996 · OSTI ID:658907

Project W-049H instrument & control acceptance test report
Technical Report · Sat Dec 31 23:00:00 EST 1994 · OSTI ID:10116991