Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Epoxy injection repairs to concrete in 225-B Building

Technical Report ·
DOI:https://doi.org/10.2172/329790· OSTI ID:329790
In 1982, the damaged anchor areas (67 total) in the Operating Gallery and cold manipulator shop ceiling reinforced concrete slabs were epoxy injection repaired by Construction Technology Laboratories (CTL), Portland Cement Association. The through depth vertical cracks (10 total) in the ceiling slabs in the galleries and manipulator shops were sealed and structurally repaired using epoxy injection procedures. The details of the epoxy reRair are reported. Sonic nondestructive (NDT) testing before and after the epoxy injection repairs were made by CTL to confirm that the repairs are structurally effective. CTL recommended to expedite the installation of lateral bracing for the manipulator monorail in order to avoid re-darnage to the repaired anchor areas.
Research Organization:
Westinghouse Hanford Co., Richland, WA (United States)
Sponsoring Organization:
USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
DOE Contract Number:
AC06-96RL13200
OSTI ID:
329790
Report Number(s):
WHC-SD-WM-ER--568; ON: DE98058409; BR: EW3135090
Country of Publication:
United States
Language:
English

Similar Records

Concrete nondestructive tests conducted in 225-B building
Technical Report · Thu Sep 19 00:00:00 EDT 1996 · OSTI ID:329777

Use of epoxy portland cement mortars to repair reinforced concrete structures
Journal Article · Tue Oct 01 00:00:00 EDT 1996 · Materials Performance · OSTI ID:376279

Vibration testing of an epoxy-repaired four-story reinforced concrete structure
Conference · Fri Dec 31 23:00:00 EST 1982 · OSTI ID:6196865