Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Reengineering and health physics within the project Hanford management contract

Conference ·
OSTI ID:325409

The impending transition of the Hartford Site management and operations (M&O) contract to a management and integrating (M&I) contract format, together with weak radiological performance assessments by external organizations and reduced financial budgets prompted the `re-engineering` of the previous Hanford prime contractor Radiological Control (Rad Con) organization. This paper presents the methodology, identified areas of improvements, and results of the re-engineering process. The conversion from the M&O to the M&I contract concept resulted in multiple independent Rad Con organizations reporting to separate major contractors who are managed by an integrating contractor. This brought significant challenges when establishing minimum site standards for sitewide consistency, developing roles and responsibilities, and maintaining site Rad Con goals. Championed by the previous contractor`s Rad Con Director, Denny Newland, a five month planning effort was executed to address the challenges of the M&I and to address identified weaknesses. Fluor Daniel Hanford assumed the responsibility as integrator of the Project Hanford Management Contract on October 1, 1996. The Fluor Daniel Hanford Radiation Protection Director Jeff Foster presents the results of the re-engineering effort, including the significant cost savings, process improvements, field support improvements, and clarification of roles and responsibilities that have been achieved.

Research Organization:
Fluor Daniel Hanford, Inc., Richland, WA (United States)
Sponsoring Organization:
USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
DOE Contract Number:
AC06-96RL13200
OSTI ID:
325409
Report Number(s):
HNF-SA--3209-FP; CONF-9706122--; ON: DE99050041; BR: EW3130010
Country of Publication:
United States
Language:
English

Similar Records

Re-engineering for remediation
Journal Article · Tue Jul 01 00:00:00 EDT 1997 · Mechanical Engineering · OSTI ID:495472

Integration plan required by performance agreement SM 7.2.1
Technical Report · Thu Mar 27 23:00:00 EST 1997 · OSTI ID:16866

Project Hanford Management Contract (PHMC) pollution prevention program implementation plan
Technical Report · Mon Dec 30 23:00:00 EST 1996 · OSTI ID:325808