Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Tank 241-AZ-102 tank characterization plan

Technical Report ·
DOI:https://doi.org/10.2172/28213· OSTI ID:28213

The Defense Nuclear Facilities Safety Board has advised the DOE to concentrate the near-term sampling and analysis activities on identification and resolution of safety issues. The Data Quality Objective (DQO) process was chosen as a tool to be used in the resolution of safety issues. As a result, a revision in the Federal Facilities Agreement and Consent Order (Tri-Party Agreement) milestone M-44 has been made, which states that ``A Tank Characterization Plan (TCP) will also be developed for each double-shell tank (DST) and single-shell tank (SST) using the DQO process ... Development of TCPs by the DQO process is intended to allow users to ensure their needs will be met and that resources are devoted to gaining only necessary information``. This document satisfies that requirement for tank 241-AZ-102 (AZ-102) sampling activities. Tank AZ-102 is currently a non-Watch List tank, so the only DQOs applicable to this tank are the safety screening DQO and the compatibility DQO, as described below. The current contents of Tank AZ-102, as of October 31, 1994, consisted of 3,600 kL (950 kgal) of dilute non-complexed waste and aging waste from PUREX (NCAW, neutralized current acid waste). Tank AZ-102 is expected to have two primary layers. The bottom layer is composed of 360 kL of sludge, and the top layer is composed of 3,240 kL of supernatant, with a total tank waste depth of approximately 8.9 meters.

Research Organization:
Westinghouse Hanford Co., Richland, WA (United States); Los Alamos Technical Associates, Inc., Kennewick, WA (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-87RL10930
OSTI ID:
28213
Report Number(s):
WHC-SD-WM-TP--228; ON: DE95007196
Country of Publication:
United States
Language:
English

Similar Records

Tank 241-AZ-101 tank characterization plan
Technical Report · Sun Feb 05 23:00:00 EST 1995 · OSTI ID:28212

Tank 241-B-104 tank characterization plan
Technical Report · Thu Apr 13 00:00:00 EDT 1995 · OSTI ID:52768

Tank 241-BX-109 tank characterization plan
Technical Report · Thu Mar 16 23:00:00 EST 1995 · OSTI ID:52742