Title: Standby power generation under utility curtailment contract agreements

Conference ·
OSTI ID:277510

Many utilities in the US offer large industrial and commercial customers power sales contracts which have attractive rates under a curtailment requirement. This curtailment requirement allows the utility to require the customer to reduce its power demand to a predetermined level within a specific time period. If the required curtailment is not achieved by the customer within the allocated time period, stiff financial penalties are usually enforced by the utility. The attractiveness of the contract rates usually is proportional to the amount of curtailment required. To take advantage of these attractive rates, a customer must be able to withstand the curtailment without supplemental generation or must add standby generation to meet its needs. Obviously, the cost of the curtailments to the customer should not exceed the economic benefits of reduced rates. This paper reviews the alternatives faced by a curtailment contract customer together with potential load shedding and standby generation system designs. An example of implementing a curtailment contract at an existing industrial facility is presented. The example facility, Boeing Helicopters of Philadelphia, Pennsylvania required both load shedding and standby generation. The load shedding scheme is fairly complex and is controlled by a programmable logic controller (PLC). The standby generation and load shedding systems for the example facility are examined in detail. Also, lessons learned from implementing the required modifications to the example facility are discussed.

OSTI ID:
277510
Report Number(s):
CONF-960509-; ISBN 0-7803-3263-6; TRN: IM9637%%19
Resource Relation:
Conference: IEEE/IAS industrial and commercial power systems technical conference, New Orleans, LA (United States), 6-10 May 1996; Other Information: PBD: 1995; Related Information: Is Part Of 1996 IEEE industrial and commercial power systems technical conference: Conference record; PB: 187 p.
Country of Publication:
United States
Language:
English

Similar Records

The option value of interruptible service contracts at electric & gas utilities
Conference · Sat Dec 31 00:00:00 EST 1994 · OSTI ID:277510

Liquid Salt Combined-Cycle Pilot Plant Design
Technical Report · Mon Feb 28 00:00:00 EST 2022 · OSTI ID:277510

Charges in standby service in California
Journal Article · Thu Oct 01 00:00:00 EDT 1987 · Cogener. Small Power Mon.; (United States) · OSTI ID:277510