Beam test results for the Endcap Timing ReadOut Chip (ETROC2) for the CMS ETL upgrade
- Fermilab
The Endcap Timing ReadOut Chip (ETROC) for the Compact Muon Solenoid (CMS) Minimum ionizing particle Timing Detector (MTD) is designed to process Low Gain Avalanche Diode (LGAD) signals with a time resolution of 40-50ps per hit, with 30-35 ps per charged particle using two layer detector. The ETROC2, is the first full size (16x16 pixels) and full functionally design that has been tested in hadron and electron beams at CERN and DESY (Sep 2023 - June 2024). Precision timing studies at these test beams are done using a self-referential beam telescope composed of up to 4 layers/chips. This talk describes the ETROC2 beam telescope and summarizes the performance of the ETROC2 chips bump-bonded to (16x16) Fondazione Bruno Kessler (FBK) and Hamamatsu Photonics K.K. (HPK) LGAD sensors using results from recent test beams. The experiences and lessons learned during the course of these test beams are also detailed in this talk.
- Research Organization:
- Fermi National Accelerator Laboratory (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC), High Energy Physics (HEP) (SC-25)
- Contributing Organization:
- CMS
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 2477631
- Report Number(s):
- FERMILAB-SLIDES-24-0293-CMS; oai:inspirehep.net:2848608
- Country of Publication:
- United States
- Language:
- English
Similar Records
The ETROC2 prototype for CMS MTD Endcap Timing Layer (ETL) upgrade
The ETROC2 prototype for CMS MTD Endcap Timing Layer (ETL) upgrade
The ETROC2 prototype for CMS MTD Endcap Timing Layer (ETL) upgrade
Conference
·
Sun Nov 17 23:00:00 EST 2024
· No journal information
·
OSTI ID:2477821
The ETROC2 prototype for CMS MTD Endcap Timing Layer (ETL) upgrade
Conference
·
Tue Jul 18 00:00:00 EDT 2023
·
OSTI ID:1993472
The ETROC2 prototype for CMS MTD Endcap Timing Layer (ETL) upgrade
Conference
·
Sun Nov 05 23:00:00 EST 2023
·
OSTI ID:2204989