Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

The ETROC2 prototype for CMS MTD Endcap Timing Layer (ETL) upgrade

Conference ·
OSTI ID:1993472

The Endcap Timing ReadOut Chip (ETROC) is designed to process LGAD signals with time resolution down to about 40-50ps per hit. The ETROC2 is the first full size (16x16) prototype design with the front-end based on and scaled up from the ETROC1 (4x4). The readout designs at pixel and global level and the system interfaces are all new and are compatible with the final chip specifications in terms of functionality. The ETROC2 is intended as a learning chip, as a stepstone to the ETROC3 which is intended as the pre-production design. The ETROC2 design and test results will be presented.

Research Organization:
Fermi National Accelerator Laboratory (FNAL), Batavia, IL (United States)
Sponsoring Organization:
USDOE Office of Science (SC), High Energy Physics (HEP) (SC-25)
DOE Contract Number:
AC02-07CH11359
OSTI ID:
1993472
Report Number(s):
FERMILAB-CONF-23-240-PPD; oai:inspirehep.net:2678093
Country of Publication:
United States
Language:
English

Similar Records

The ETROC2 prototype for CMS MTD Endcap Timing Layer (ETL) upgrade
Conference · Sun Nov 05 23:00:00 EST 2023 · OSTI ID:2204989

The ETROC2 prototype for CMS MTD Endcap Timing Layer (ETL) upgrade
Conference · Sun Nov 17 23:00:00 EST 2024 · No journal information · OSTI ID:2477821

Beam test results for the Endcap Timing ReadOut Chip (ETROC2) for the CMS ETL upgrade
Conference · Thu Nov 14 23:00:00 EST 2024 · OSTI ID:2477631