Upgrade of a paper mill power distribution system
Journal Article
·
· IEEE Transactions on Industry Applications
- Westvaco, Charleston, SC (United States). Kraft Div.
- Westvaco, Laurel, MD (United States). Dept. of Corporate Engineering
A utility capacity increase from 50 to 100 MVA was implemented in a large Kraft paper mill. All existing plant 15-kV switchgear and controls were replaced and a new tie line constructed during a nine-month period prior to the utility increase. Electrical and process control rooms were built to house new switchgear and computer control equipment. All installation work was done during outages scheduled for other plant objectives. New switchgear installed consists of 42 cells of 1,000-MVA class equipment. The control system includes operator workstations, supervisory PLC, and remote I/O racks. Breaker control, metering, and loadshedding functions are performed by the control system.
- OSTI ID:
- 242219
- Journal Information:
- IEEE Transactions on Industry Applications, Journal Name: IEEE Transactions on Industry Applications Journal Issue: 2 Vol. 32; ISSN 0093-9994; ISSN ITIACR
- Country of Publication:
- United States
- Language:
- English
Similar Records
West Enfield Hydroelectric Facility advanced control system
Upgraded electrical distribution system improves reliability
BUILDOUT AND UPGRADE OF CENTRAL EMERGENCY GENERATOR SYSTEM, GENERATOR 3 AND 4 ELECTRICAL INSTALLATION
Conference
·
Sat Dec 31 23:00:00 EST 1988
· Proceedings of the American Power Conference; (USA)
·
OSTI ID:6738625
Upgraded electrical distribution system improves reliability
Journal Article
·
Tue Sep 01 00:00:00 EDT 1981
· Spec. Eng.; (United States)
·
OSTI ID:5459889
BUILDOUT AND UPGRADE OF CENTRAL EMERGENCY GENERATOR SYSTEM, GENERATOR 3 AND 4 ELECTRICAL INSTALLATION
Technical Report
·
Sat Jul 01 00:00:00 EDT 2006
·
OSTI ID:911893