Mosenergo Ryazan Repowering Project (GRES-24). Feasibility study. Export trade information
This study, conducted by GE Power Systems Engineering, was funded by the U.S. Trade and Development Agency. The objective of this study was to determine the technical and economic feasibility and demonstrate the financial attractiveness of repowering Mosenergo`s power plant. The report covers the overall efficiency and cycle output of the repowered cycle, as well unit costs for fuel pricing and electricity. The report is divided into the following sections: Executive Summary (I) Summary of Technical, Economic and Financing Analyses Tab 1; Overview (II) Detail Analyses/Reports Tab 2; General Electric Power Systems Tab 3; Teploelectroproject (TEP) Tab 4; Machine-Building Factory of Podoslk Tab 5; Russian Project Finance Bank Tab 6; Gilbert Commonwealth. (III) Drawings (in Russian Version only).
- Research Organization:
- General Electric Co., Schenectady, NY (United States)
- OSTI ID:
- 229292
- Report Number(s):
- PB--96-153689/XAB
- Country of Publication:
- United States
- Language:
- English
Similar Records
Surgut power plant No. 1, block No. 1 reconstruction: Financial feasibility study. Export trade information
Repowering of lenenergo severnaya TETS-21 with lm6000 gas turbine. Export trade information