Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Progress in development of pulsed resonant charging power supply for the Spallation Neutron Source extraction kicker PFN system

Conference ·
A conceptual design of the pulsed resonant charging power supply (RCPS) for the beam extraction system of the Spallation Neutron Source (SNS) at the Oak Ridge National Laboratory (ORNL) was previously reported at the 2019 IEEE Pulsed Power & Plasma Science Conference (PPPS 2019) [1]. Development and testing of the prototype supply continued through the year to finalize the design ahead of the Proton Power Upgrade (PPU). Testing revealed reliability issues with the original resonant charging scheme related to the step-up transformer core. Additional components were incorporated into the system, and some of the original prototype components were replaced to improve performance and reliability of the power supply. This paper describes the changes in the resonant charging scheme, presents the results of testing of the improved prototype at full power level, and shows the final design of the RCPS.
Research Organization:
Oak Ridge National Laboratory (ORNL), Oak Ridge, TN (United States)
Sponsoring Organization:
USDOE; USDOE Office of Science (SC), Basic Energy Sciences (BES) (SC-22)
DOE Contract Number:
AC05-00OR22725
OSTI ID:
2283887
Country of Publication:
United States
Language:
English

Similar Records

Pulsed Resonant Charging Power Supply for the Spallation Neutron Source Extraction Kicker PFN System
Conference · Sat Jun 01 00:00:00 EDT 2019 · OSTI ID:1608221

The Upgrade of the SNS Extraction Kicker Power Supplies for the Proton Power Upgrade
Conference · Wed Apr 30 20:00:00 EDT 2025 · OSTI ID:2573623

SNS EXTRACTION KICKER POWER SUPPLY PROTOTYPE TEST
Conference · Tue Jun 27 00:00:00 EDT 2000 · OSTI ID:760992

Related Subjects