Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Pulsed Resonant Charging Power Supply for the Spallation Neutron Source Extraction Kicker PFN System

Conference ·
The Spallation Neutron Source (SNS) at Oak Ridge National Laboratory uses fourteen pulsed modulators in the extraction system to deflect the proton beam from the accumulation ring to the target. Each individual pulse modulator is a pulse-forming network (PFN) located in a service building external to the ring tunnel. SNS is in the planning and development phase of a proton power upgrade (PPU) to increase the beam energy from 1.0 to 1.3 GeV, and the extraction system is required to provide the same deflection at the higher beam energy. Increasing the magnet current, by charging the PFN to a higher voltage, by 20% will provide the required deflection. The existing capacitor charging power supply is incapable of charging the PFN to higher voltages between the 60 Hz pulses; therefore, a new resonant charging scheme has been developed to charge to the PPU higher voltage within the available time. This paper describes the resonant charging power supply design and presents test results from a prototype operating on a full system test stand.
Research Organization:
Oak Ridge National Laboratory (ORNL), Oak Ridge, TN (United States)
Sponsoring Organization:
USDOE; USDOE Office of Science (SC), Basic Energy Sciences (BES) (SC-22)
DOE Contract Number:
AC05-00OR22725
OSTI ID:
1608221
Country of Publication:
United States
Language:
English

References (2)

Thyratron replacement for the spallation neutron source linac extraction kicker PFN system conference May 2015
SNS proton power upgrade requirements for magnet and kicker systems conference June 2017

Similar Records

Progress in development of pulsed resonant charging power supply for the Spallation Neutron Source extraction kicker PFN system
Conference · Tue Jun 01 00:00:00 EDT 2021 · OSTI ID:2283887

The Upgrade of the SNS Extraction Kicker Power Supplies for the Proton Power Upgrade
Conference · Wed Apr 30 20:00:00 EDT 2025 · OSTI ID:2573623

SNS EXTRACTION KICKER POWER SUPPLY PROTOTYPE TEST
Conference · Tue Jun 27 00:00:00 EDT 2000 · OSTI ID:760992

Related Subjects