Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Institutional project summary University of Redlands direct fired gas absorption chiller system

Conference ·
OSTI ID:227096
The University of Redlands, located in the California Inland Empire City of Redlands supplies six campus building with chilled and hot water for cooling and space heating from a centrally located Mechanical Center. The University was interested in lowering chilled water production costs and eliminating Ozone depleting chloroflourocarbon (CFC) refrigerants in addition to adding chiller capacity for future building to be added to the central plant piping {open_quotes}loop{close_quotes}. After initially providing a feasibility study of chiller addition alternatives and annual hourly load models, GRT & Associates, Inc. (GRT) provided design engineering for the installation of a 500 Ton direct gas fired absorption chiller addition to the University of Redland`s mechanical center. Based on the feasibility study and energy consumption tests done after the new absorption chiller was added, the university estimates annual energy cost saving versus the existing electric chiller is approximately $65,000 per year. Using actual construction costs, the simple before tax payback period for the project is six years.
OSTI ID:
227096
Report Number(s):
CONF-951173--
Country of Publication:
United States
Language:
English

Similar Records

Re-centralized central chiller plant serves hospital
Journal Article · Thu May 01 00:00:00 EDT 1997 · Heating, Piping and Air Conditioning · OSTI ID:492152

Operating comparison of absorption and centrifugal chillers
Journal Article · Sat Oct 01 00:00:00 EDT 1994 · ASHRAE Journal (American Society of Heating, Refrigerating and Air-Conditioning Engineers); (United States) · OSTI ID:6829348

CFCS and electric chillers: Selection of large-capacity water chillers in the 1990s
Technical Report · Sat Feb 29 23:00:00 EST 1992 · OSTI ID:5343250