Beamline front end for in-vacuum short period undulator at the photon factory storage ring
Journal Article
·
· AIP Conference Proceedings
- Accelerator Laboratory, High Energy Accelerator Research Organization (KEK), 1-1 Oho, Tsukuba, Ibaraki 305-0801 (Japan)
The straight-section upgrade project of the Photon Factory created four new short straight sections capable of housing in-vacuum short period undulators. The first to fourth short period undulators SGU#17, SGU#03, SGU#01 and SGU#15 were installed at the 2.5-GeV Photon Factory storage ring in 2005, 2006, 2009 and 2013, respectively. The beamline front end for SGU#15 is described in this paper.
- OSTI ID:
- 22608325
- Journal Information:
- AIP Conference Proceedings, Journal Name: AIP Conference Proceedings Journal Issue: 1 Vol. 1741; ISSN APCPCS; ISSN 0094-243X
- Country of Publication:
- United States
- Language:
- English
Similar Records
Beamline Front-End for Minipole Undulator at the Photon Factory Storage Ring
Beamline Front-End For The In-Vacuum Minipole Undulator At The 2.5-GeV Photon Factory Storage Ring
Construction of a Very Short Period Undulator, SGU no. 17 and the Photon Factory Upgrade
Journal Article
·
Wed Jun 23 00:00:00 EDT 2010
· AIP Conference Proceedings
·
OSTI ID:21410321
Beamline Front-End For The In-Vacuum Minipole Undulator At The 2.5-GeV Photon Factory Storage Ring
Journal Article
·
Thu Jan 18 23:00:00 EST 2007
· AIP Conference Proceedings
·
OSTI ID:21049195
Construction of a Very Short Period Undulator, SGU no. 17 and the Photon Factory Upgrade
Journal Article
·
Thu Jan 18 23:00:00 EST 2007
· AIP Conference Proceedings
·
OSTI ID:21052532