Saxon Falls Dam rehabilitation
Conference
·
OSTI ID:220024
- Northern State Power Company, Eau Claire, WI (United States)
- Barr Engineering Co., Minneapolis, MN (United States)
The Saxon Falls Hydro Project is a high-head hydro owned and operated by Northern States Power Company (NSP) in northwest Wisconsin. Saxon Falls comprises a concrete buttress overflow spillway; mass-concrete tainter gate spillway, conduit intake, and nonoverflow section; earth dam; 1,600-foot-long, 72-inch-diameter steel conduit; two 150-foot-long, 54-inch-diameter penstocks; steel surge tank; and reinforced concrete powerhouse. All structures are founded on bedrock. Engineering inspections revealed severe concrete deterioration and leakage within the intake and deterioration of the middle nonoverflow section. Subsequent to the inspection, concrete cores confirmed the level of deterioration and indicated that immediate measures were necessary to correct the deficiencies and restore project integrity. Because the dam is located on the border between Michigan and Wisconsin, coordination with the respective Departments of Natural Resources was crucial to obtain permits to construct the repairs. Due to concerns regarding a sensitive fishery, a reservoir drawdown was not allowed. To accomplish the work and allow for a suitable construction area, a special braced sheetpile cofferdam was required to complete the project. NSP elected to complete the construction using its own special-construction crews. Close coordination allowed construction personnel, the owner, and the engineer to overcome difficulties encountered during construction.
- OSTI ID:
- 220024
- Report Number(s):
- CONF-9507190--
- Country of Publication:
- United States
- Language:
- English
Similar Records
Uplift investigations at Tillery Dam
Foote Hydroelectric Plant spillway rehabilitation
Completion of embankment, spillway, and outlet works. Foundation report
Conference
·
Sat Dec 30 23:00:00 EST 1995
·
OSTI ID:220011
Foote Hydroelectric Plant spillway rehabilitation
Conference
·
Tue Oct 01 00:00:00 EDT 1996
·
OSTI ID:376182
Completion of embankment, spillway, and outlet works. Foundation report
Technical Report
·
Wed Aug 01 00:00:00 EDT 1990
·
OSTI ID:5912132