Using modeling to develop and evaluate a corrective action system
- Benchmark Engineering Inc., Birmingham, AL (United States)
At a former trucking facility in EPA Region 4, a corrective action system was installed to remediate groundwater and soil contaminated with gasoline and fuel oil products released from several underground storage tanks (USTs). Groundwater modeling was used to develop the corrective action plan and later used with soil vapor modeling to evaluate the systems effectiveness. Groundwater modeling was used to determine the effects of a groundwater recovery system on the water table at the site. Information gathered during the assessment phase was used to develop a three dimensional depiction of the subsurface at the site. Different groundwater recovery schemes were then modeled to determine the most effective method for recovering contaminated groundwater. Based on the modeling and calculations, a corrective action system combining soil vapor extraction (SVE) and groundwater recovery was designed. The system included seven recovery wells, to extract both soil vapor and groundwater, and a groundwater treatment system. Operation and maintenance of the system included monthly system sampling and inspections and quarterly groundwater sampling. After one year of operation the effectiveness of the system was evaluated. A subsurface soil gas model was used to evaluate the effects of the SVE system on the site contamination as well as its effects on the water table and groundwater recovery operations. Groundwater modeling was used in evaluating the effectiveness of the groundwater recovery system. Plume migration and capture were modeled to insure that the groundwater recovery system at the site was effectively capturing the contaminant plume. The two models were then combined to determine the effects of the two systems, acting together, on the remediation process.
- OSTI ID:
- 215565
- Report Number(s):
- CONF-951139--
- Country of Publication:
- United States
- Language:
- English
Similar Records
Soil and groundwater remediation using dual-phase extraction technology
Implementation of an In Situ Soil Vapor Extraction Pilot Study at Technical Area 54 at the Los Alamos National Laboratory