Fiscal year 1995 laboratory scale studies of Cs elution in Tank 8D-1 and sludge dissolution in tank 8D-2
During Phase I of West Valley Demonstration project waste remediation, an estimated 95% of the zeolite currently in tank 8D-1 will be transferred to tank 8D-2, leaving behind residual Cs-loaded zeolite which will require treatment to remove the Cs. After phase I vitrification, tank 8D-2 will contain residual waste from PUREX and THOREX and spent Cs-loaded zeolite. The residual waste will require treatment. Oxalic acid has been proposed for eluting Cs from zeolite in tank 8D-1 and dissolving radionuclides in tank 8D-2. Laboratory tests were performed to determine optimum Cs elution and sludge dissolution conditions and to evaluate effects of multiple contacts, long-term contacts, presence of corrosion products, lack of agitation, temperature of tank contents, and oxalic acid concentration. Mild steel corrosion tests were also conducted.
- Research Organization:
- Pacific Northwest Lab., Richland, WA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC06-76RL01830
- OSTI ID:
- 212676
- Report Number(s):
- PNNL--10945; ON: DE96009900
- Country of Publication:
- United States
- Language:
- English
Similar Records
Fiscal year 1996 laboratory scale studies of cesium elution in tank 8D-1
West Valley Tank 8D-1 and 8D-2 Inventory Estimation Methodology
Fiscal year 1996 laboratory scale studies of the WVNS flowsheet for remediation of Tank 8D-1 and Tank 8D-2
Technical Report
·
Sun Sep 01 00:00:00 EDT 1996
·
OSTI ID:374109
West Valley Tank 8D-1 and 8D-2 Inventory Estimation Methodology
Technical Report
·
Fri Jul 20 00:00:00 EDT 2001
·
OSTI ID:15001230
Fiscal year 1996 laboratory scale studies of the WVNS flowsheet for remediation of Tank 8D-1 and Tank 8D-2
Technical Report
·
Thu Oct 31 23:00:00 EST 1996
·
OSTI ID:414286