Title: Cost calculations at early stages of nuclear research facilities in the nordic countries

Conference ·
OSTI ID:21156355
 [1];  [2];  [3]; ;  [4]; ;  [5];  [6];  [7]
  1. Danish Decommissioning (Denmark)
  2. VTT Technical Research Centre of Finland, P.O. Box 1805 - Kemistintie 3, Espoo, FIN - 02044 VTT (Finland)
  3. Institute for Energy Technology (Norway)
  4. The Swedish Nuclear Power Inspectorate, Klarabergsviadukten 90, SE-106 58 Stockholm (Sweden)
  5. The Swedish Radiation Protection Authority, SE-171 16 Stockholm (Sweden)
  6. Studsvik Nuclear AB (Sweden)
  7. Tekedo AB, Spinnarvaegen 10, 611 63 Nykoeping (Sweden)

The Nordic countries Denmark, Norway and Sweden, and to some extent also Finland, had very large nuclear research and development programs for a few decades starting in the nineteen fifties. Today, only some of the facilities are in use. Some have been decommissioned and dismantled while others are at various stages of planning for shutdown. The perspective ranges from imminent to several decades. It eventually became realized that considerable planning for the future decommissioning is warranted and that an integral part of this planning is financial, including how financial funds should be acquired, used and allocated over time. This necessitates that accurate and reliable cost estimates be obtained at all stages. However, this is associated with fundamental difficulties and treacherous complexities, especially for the early ones. Eventually, Denmark and Norway decided not to build any nuclear power plants while Finland and Sweden did. This is reflected in the financing where the latter countries have established systems with special funds in which money is being collected now to cover the future costs for the decommissioning of the research facilities. Nonetheless, the needs for planning for the decommissioning of nuclear research facilities are very similar. However, they differ considerably from those of nuclear power reactors, especially with regard to cost calculations. It has become apparent in the course of work that summation types of cost estimation methodologies give rise to large systematic errors if applied at early stages, in which case comparison based assessments are less biased and may be more reliable. Therefore, in order to achieve the required quality of the cost calculations, it is necessary that data and experience from authentic cases be utilized in models for cost calculations. It also implies that this calculation process should include a well adopted learning process. Thus, a Nordic co-operation has been established for the exchange and evaluation of cost-related information on nuclear research facilities. The aim is to identify good practices, accumulate experience, compile data from actual plants and projects, and to derive methodology for cost calculations, especially for early stages. The work includes the following tasks which constitutes the bulk of the present paper: identification of good practice with regard to the following: - strategy and planning; - methodology selection; - radiological surveying; - uncertainty analysis. - descriptions of relevant plants, features and projects: - decommissioning of reactor DR 1 in Denmark; - decommissioning of reactor R 1 in Sweden; - decommissioning of the pilot scale uranium fuel; reprocessing plant in Norway - planning for the future decommissioning of the TRIGA reactor in Finland. - techniques for assessments of costs introduction. (authors)

Research Organization:
American Society of Mechanical Engineers (ASME), Three Park Avenue, New York, NY 10016-5990 (United States); Technological Institute of the Royal Flemish Society of Engineers (TI-K VIV), Het Ingenieurshuis, Desguinlei 214, 2018 Antwerp (Belgium); Belgian Nuclear Society (BNS) - ASBL-VZW, c/o SCK-CEN, Avenue Hermann Debrouxlaan, 40 - B-1160 Brussels (Belgium)
OSTI ID:
21156355
Resource Relation:
Conference: ICEM'07: 11. International Conference on Environmental Remediation and Radioactive Waste Management, Bruges (Belgium), 2-6 Sep 2007; Other Information: Country of input: France; 17 refs.; Proceedings may be ordered from ASME Order Department, 22 Law Drive, P.O. Box 2300, Fairfield, NJ 07007-2300 (United States)
Country of Publication:
United States
Language:
English

Similar Records

Nuclear power in the Nordic countries
Journal Article · Tue Jun 01 00:00:00 EDT 1993 · NUEXCO. Monthly Report to the Nuclear Industry; (United States) · OSTI ID:21156355

Half a Century of Nordic Nuclear Co-operation - An Insider's Recollections
Journal Article · Wed Dec 01 00:00:00 EST 1999 · Health Physics · OSTI ID:21156355

Financial Planning as a Tool for Efficient and Timely Decommissioning of Nuclear Research Facilities
Conference · Tue Jan 15 00:00:00 EST 2008 · OSTI ID:21156355