Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

ACE: Proton beam upgrade plan at Fermilab

Conference ·
DOI:https://doi.org/10.2172/2007039· OSTI ID:2007039
aFor Snowmass and P5, Fermilab recently proposed a new upgrade plan known as Accelerator Complex Evolution (ACE) to occur after PIP-II upgrade in tandem with DUNE/LBNF operation. The first phase of ACE, ACE-MIRT, is the ACE Main Injector Ramp and Targetry upgrade, which would raise the LBNF beam power from 1.2 MW to 2 MW by shortening the Main Injector cycle time to around 0.65s. The second phase of ACE, AC-BR, is the ACE Booster Replacement, which would replace the Booster with a new machine and achieve 2.4 MW for DUNE/LBNF. The implications for the Fermilab neutrino program and future experiments hosted at Fermilab will be discussed.
Research Organization:
Fermi National Accelerator Laboratory (FNAL), Batavia, IL (United States)
Sponsoring Organization:
USDOE Office of Science (SC), High Energy Physics (HEP) (SC-25)
DOE Contract Number:
AC02-07CH11359
OSTI ID:
2007039
Report Number(s):
FERMILAB-SLIDES-23-246-AD; oai:inspirehep.net:2704742
Country of Publication:
United States
Language:
English

Similar Records

Accelerator challenges in the Fermilab Neutrino Program
Conference · Mon Jan 15 23:00:00 EST 2024 · OSTI ID:2282630

A Cost-Effective Upgrade Path for the Fermilab Accelerator Complex
Technical Report · Thu Nov 11 23:00:00 EST 2021 · OSTI ID:1834190

An Upgrade Path for the Fermilab Accelerator Complex
Technical Report · Thu Jun 10 00:00:00 EDT 2021 · OSTI ID:1865351