Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

An Upgrade Path for the Fermilab Accelerator Complex

Technical Report ·
DOI:https://doi.org/10.2172/1865351· OSTI ID:1865351
The completion of the PIP-II project and its superconducting linear accelerator will provide up to 1.2 MW of beam power to the LBNF/DUNE facility for neutrino physics. It will also be able to produce high-power beams directly from the linac that can be used for lower-energy particle physics experiments as well, such as directing beam toward the Muon Campus at Fermilab for example. Any further significant upgrade of the beam power to DUNE, however, will be impeded by the limitations of the present Booster synchrotron at the facility. To increase the power to DUNE by a factor of two would require a new accelerator arrangement to feed the Main Injector that does not include the Booster. In what follows, a path toward upgrading the Fermilab accelerator complex to bring the beam power for DUNE to 2.4 MW is presented, using a new rapid-cycling synchrotron plus an energy upgrade to the PIP-II linac. The path includes the ability to instigate a new lower-energy, very high-power beam delivery system for experiments that can address much of the science program presented by the Booster Replacement Science Working Group. It also allows for the future possibility to go beyond 2.4 MW up to roughly 4 MW from the Main Injector.
Research Organization:
Fermi National Accelerator Laboratory (FNAL), Batavia, IL (United States)
Sponsoring Organization:
USDOE Office of Science (SC), High Energy Physics (HEP)
DOE Contract Number:
AC02-07CH11359
OSTI ID:
1865351
Report Number(s):
TM-2754-AD-APC-PIP2-TD; FERMILAB-TM-2754-AD-APC-PIP2-TD; arXiv:2106.02133; oai:inspirehep.net:1867161
Country of Publication:
United States
Language:
English

Similar Records

A Cost-Effective Upgrade Path for the Fermilab Accelerator Complex
Technical Report · Thu Nov 11 23:00:00 EST 2021 · OSTI ID:1834190

Accelerator challenges in the Fermilab Neutrino Program
Conference · Mon Jan 15 23:00:00 EST 2024 · OSTI ID:2282630

ACE: Proton beam upgrade plan at Fermilab
Conference · Fri Sep 29 00:00:00 EDT 2023 · OSTI ID:2007039

Related Subjects