PIP-II SSR2 Cavities Fabrication and Processing Experience
Conference
·
OSTI ID:1993473
- Fermilab
- IJCLab, Orsay
The Proton Improvement Plan-II (PIP-II [1]) linac will include 35 Single Spoke Resonators type 2 (SSR2). A preproduction SSR2 cryomodule will contain 5 jacketed cavities. Several units are already manufactured and prepared for cold testing. In this work, data collected from the fabrication, processing and preparation of the cavities will be presented and the improvements implemented after the completion of the first unit will be highlighted.
- Research Organization:
- Fermi National Accelerator Laboratory (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC), High Energy Physics (HEP) (SC-25)
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 1993473
- Report Number(s):
- FERMILAB-CONF-23-335-TD; arXiv:2307.08852; oai:inspirehep.net:2678233
- Country of Publication:
- United States
- Language:
- English
Similar Records
Fabrication experience of the pre-production PIP-II SSR2 cavities at Fermilab
Mechanical Design and Fabrication Aspects of Prototype SSR2 Jacketed Cavities
Cold Test Results of Pre-Production PIP-II SSR2 Cavities with High-Power Couplers in the Fermilab Spoke Test Cryostat
Conference
·
Tue Sep 06 00:00:00 EDT 2022
·
OSTI ID:1886003
Mechanical Design and Fabrication Aspects of Prototype SSR2 Jacketed Cavities
Conference
·
Sat Aug 17 00:00:00 EDT 2019
·
OSTI ID:1843469
Cold Test Results of Pre-Production PIP-II SSR2 Cavities with High-Power Couplers in the Fermilab Spoke Test Cryostat
Conference
·
Sun Nov 24 23:00:00 EST 2024
·
OSTI ID:2479554