Fabrication experience of the pre-production PIP-II SSR2 cavities at Fermilab
Conference
·
OSTI ID:1886003
The Proton Improvement Plan-II (PIP-II, [1]) linac will include 35 Single Spoke Resonators type 2 (SSR2). A total of eight pre-production SSR2 jacketed cavities will be procured and five installed in the first pre-production cryomodule. The mechanical design of the jacketed cavity has been finalized and it will be presented in this paper along with fabrication and processing experience. The importance of interfaces, quality controls and procurement aspects in the design phase will be remarked as well as lessons learned during the fabrication process. Furthermore, development studies will be presented together with other design validation tests.
- Research Organization:
- Fermi National Accelerator Laboratory (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC), High Energy Physics (HEP) (SC-25)
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 1886003
- Report Number(s):
- FERMILAB-CONF-22-636-TD; arXiv:2209.02496; oai:inspirehep.net:2147411
- Country of Publication:
- United States
- Language:
- English
Similar Records
PIP-II SSR2 Cavities Fabrication and Processing Experience
Mechanical Design and Fabrication Aspects of Prototype SSR2 Jacketed Cavities
Cold Test Results of Pre-Production PIP-II SSR2 Cavities with High-Power Couplers in the Fermilab Spoke Test Cryostat
Conference
·
Mon Jul 17 00:00:00 EDT 2023
·
OSTI ID:1993473
Mechanical Design and Fabrication Aspects of Prototype SSR2 Jacketed Cavities
Conference
·
Sat Aug 17 00:00:00 EDT 2019
·
OSTI ID:1843469
Cold Test Results of Pre-Production PIP-II SSR2 Cavities with High-Power Couplers in the Fermilab Spoke Test Cryostat
Conference
·
Sun Nov 24 23:00:00 EST 2024
·
OSTI ID:2479554