Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure; A Nationwide Assessment

Program Document ·
OSTI ID:1988038
Ambitious federal clean goals, along with historic investment in American manufacturing, have put the United States on track to see 30-42 million light-duty electric vehicles (EVs) on the road by 2030. Now, a groundbreaking study from the National Renewable Energy Laboratory (NREL) has estimated the EV charging infrastructure needed nationwide to support a sweeping transition to electrified transportation. The study, titled "The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure," estimates the number, type, and location of the chargers needed to create a comprehensive network of EV charging infrastructure. Its use of proprietary NREL software tools and sophisticated analysis have resulted in a nationwide infrastructure needs assessment with a never-before-seen level of detail - one that takes into account the different ways Americans travel, from running errands to taking road trips, and can adjust to changing circumstances as EV adoption rates change over time.
Research Organization:
National Renewable Energy Laboratory (NREL), Golden, CO (United States)
Sponsoring Organization:
USDOE National Renewable Energy Laboratory (NREL)
DOE Contract Number:
AC36-08GO28308
OSTI ID:
1988038
Report Number(s):
NREL/FS-5400-85970; MainId:86743; UUID:fbd6fcdc-9aa6-42c3-b407-80f7220640e1; MainAdminID:69889
Country of Publication:
United States
Language:
English