Determination of the radioactive material and plutonium holdup in ducts and piping in the 324 Building
This report describes the measurements Performed to determine the radionuclide content and mass of plutonium in exposed ducts, filters, and piping in the 324 Building at the US Department of Energy Hanford Site in Washington State. This information is needed to characterize facility radiation levels, to verify compliance with criticality safety specifications, and to allow more accurate nuclear material control using nondestructive assay (NDA) methods. Gamma assay techniques typically employed for NDA analysis were used to determine the gamma-emitting isotopes in the ducts, filters, and piping. Passive neutron counting was selected to estimate -the plutonium content because high gamma levels from fission and activation products effectively mask any gamma emissions from plutonium. A high-purity gamma-ray detector Was used to measure the mixed fission and activation radionuclides. A neutron slab detector containing five {sup 3}He proportional counters was used to determine the neutron emission rates and estimate the mass of plutonium present. Both measurement systems followed the methods and procedures routinely used for nuclear waste assay and safeguards measurements.
- Research Organization:
- Pacific Northwest Lab., Richland, WA (United States)
- Sponsoring Organization:
- USDOE National Nuclear Security Administration (NNSA), Nuclear Criticality Safety Program (NCSP)
- DOE Contract Number:
- AC06-76RL01830
- OSTI ID:
- 197851
- Report Number(s):
- PNNL--10935; ON: DE96004606
- Country of Publication:
- United States
- Language:
- English
Similar Records
Determination of the radioactive material and plutonium holdup in ducts and piping in the 327 Building
Determination of the radioactive material and plutonium holdup in ducts and piping in the 325 Building
EBRII cask characterization measurements
Technical Report
·
Thu Aug 31 20:00:00 EDT 1995
·
OSTI ID:113871
Determination of the radioactive material and plutonium holdup in ducts and piping in the 325 Building
Technical Report
·
Wed Jul 31 20:00:00 EDT 1996
·
OSTI ID:371210
EBRII cask characterization measurements
Technical Report
·
Sun Dec 31 23:00:00 EST 1995
·
OSTI ID:197852