Updated Baseline Cost Model for Hydropower (2023)
- Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); ORNL
The "Updated Baseline Cost Model (BCM) for Hydropower" is an empirical model for estimating the costs of US hydropower projects in six categories (Non-Powered Dam (NPD), New Stream Development (NSD), Canal/Conduit, Pumped Storage Hydro (PSH), Capacity Expansion, Generator Rewind). The model equations have been estimated with data on existing or planned projects obtained from various sources. NOTE: This is a macro-enabled workbook, so Excel may block it on the first opening. In that case: 1. Save the workbook to a local directory 2. Right-click on the workbook in the local directory and select “Properties” 3. Then check “Unblock” at the bottom of the “General” tab.
- Research Organization:
- Oak Ridge National Laboratory (ORNL), Oak Ridge, TN (United States)
- Sponsoring Organization:
- USDOE Office of Energy Efficiency and Renewable Energy (EERE), Renewable Power Office. Water Power Technologies Office
- DOE Contract Number:
- AC05-00OR22725
- OSTI ID:
- 1968485
- Country of Publication:
- United States
- Language:
- English
Similar Records
Hydropower Investment and Public-Private Ecosystem Assessment
Hydropower Baseline Cost Modeling
Hydropower Baseline Cost Modeling, Version 2
Technical Report
·
Thu Mar 07 23:00:00 EST 2024
·
OSTI ID:2324600
Hydropower Baseline Cost Modeling
Technical Report
·
Wed Dec 31 23:00:00 EST 2014
·
OSTI ID:1185882
Hydropower Baseline Cost Modeling, Version 2
Technical Report
·
Tue Sep 01 00:00:00 EDT 2015
·
OSTI ID:1244193