Updated Baseline Cost Model for Hydropower (2023)

Dataset ·
 [1];
  1. Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); ORNL

The "Updated Baseline Cost Model (BCM) for Hydropower" is an empirical model for estimating the costs of US hydropower projects in six categories (Non-Powered Dam (NPD), New Stream Development (NSD), Canal/Conduit, Pumped Storage Hydro (PSH), Capacity Expansion, Generator Rewind). The model equations have been estimated with data on existing or planned projects obtained from various sources. NOTE: This is a macro-enabled workbook, so Excel may block it on the first opening. In that case: 1. Save the workbook to a local directory 2. Right-click on the workbook in the local directory and select “Properties” 3. Then check “Unblock” at the bottom of the “General” tab.

Research Organization:
Oak Ridge National Laboratory (ORNL), Oak Ridge, TN (United States)
Sponsoring Organization:
USDOE Office of Energy Efficiency and Renewable Energy (EERE), Renewable Power Office. Water Power Technologies Office
DOE Contract Number:
AC05-00OR22725
OSTI ID:
1968485
Country of Publication:
United States
Language:
English

Similar Records

Hydropower Investment and Public-Private Ecosystem Assessment
Technical Report · Thu Mar 07 23:00:00 EST 2024 · OSTI ID:2324600

Hydropower Baseline Cost Modeling
Technical Report · Wed Dec 31 23:00:00 EST 2014 · OSTI ID:1185882

Hydropower Baseline Cost Modeling, Version 2
Technical Report · Tue Sep 01 00:00:00 EDT 2015 · OSTI ID:1244193

Related Subjects