Title: Hydropower Baseline Cost Modeling

Abstract

Recent resource assessments conducted by the United States Department of Energy have identified significant opportunities for expanding hydropower generation through the addition of power to non-powered dams and on undeveloped stream-reaches. Additional interest exists in the powering of existing water resource infrastructure such as conduits and canals, upgrading and expanding existing hydropower facilities, and the construction new pumped storage hydropower. Understanding the potential future role of these hydropower resources in the nation’s energy system requires an assessment of the environmental and techno-economic issues associated with expanding hydropower generation. To facilitate these assessments, this report seeks to fill the current gaps in publically available hydropower cost-estimating tools that can support the national-scale evaluation of hydropower resources.

Authors:
 [1];  [1];  [1];  [1];  [1]
  1. Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)
Publication Date:
Research Org.:
Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)
Sponsoring Org.:
USDOE
OSTI Identifier:
1185882
Report Number(s):
ORNL/TM-2015/14
WC0100000; CEWW099
DOE Contract Number:
DE-AC05-00OR22725
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
Hydropower; Cost Modeling; Parametric Models; Capital Costs

Citation Formats

O'Connor, Patrick W., Zhang, Qin Fen, DeNeale, Scott T., Chalise, Dol Raj, and Centurion, Emma E.. Hydropower Baseline Cost Modeling. United States: N. p., 2015. Web. doi:10.2172/1185882.
O'Connor, Patrick W., Zhang, Qin Fen, DeNeale, Scott T., Chalise, Dol Raj, & Centurion, Emma E.. Hydropower Baseline Cost Modeling. United States. doi:10.2172/1185882.
O'Connor, Patrick W., Zhang, Qin Fen, DeNeale, Scott T., Chalise, Dol Raj, and Centurion, Emma E.. Thu . "Hydropower Baseline Cost Modeling". United States. doi:10.2172/1185882. https://www.osti.gov/servlets/purl/1185882.
@article{osti_1185882,
title = {Hydropower Baseline Cost Modeling},
author = {O'Connor, Patrick W. and Zhang, Qin Fen and DeNeale, Scott T. and Chalise, Dol Raj and Centurion, Emma E.},
abstractNote = {Recent resource assessments conducted by the United States Department of Energy have identified significant opportunities for expanding hydropower generation through the addition of power to non-powered dams and on undeveloped stream-reaches. Additional interest exists in the powering of existing water resource infrastructure such as conduits and canals, upgrading and expanding existing hydropower facilities, and the construction new pumped storage hydropower. Understanding the potential future role of these hydropower resources in the nation’s energy system requires an assessment of the environmental and techno-economic issues associated with expanding hydropower generation. To facilitate these assessments, this report seeks to fill the current gaps in publically available hydropower cost-estimating tools that can support the national-scale evaluation of hydropower resources.},
doi = {10.2172/1185882},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Thu Jan 01 00:00:00 EST 2015},
month = {Thu Jan 01 00:00:00 EST 2015}
}

Technical Report:

Save / Share:
  • Recent resource assessments conducted by the United States Department of Energy have identified significant opportunities for expanding hydropower generation through the addition of power to non-powered dams and on undeveloped stream-reaches. Additional interest exists in the powering of existing water resource infrastructure such as conduits and canals, upgrading and expanding existing hydropower facilities, and the construction new pumped storage hydropower. Understanding the potential future role of these hydropower resources in the nation’s energy system requires an assessment of the environmental and techno-economic issues associated with expanding hydropower generation. To facilitate these assessments, this report seeks to fill the current gapsmore » in publically available hydropower cost estimating tools that can support the national-scale evaluation of hydropower resources.« less
  • A study was made to compare tunnel construction costs between the Subterrene tunneling system and methods currently in use. Three completed tunnels were selected for study cases to represent finished diameters ranging from 3.05 meters (10 feet) to 6.25 meters (20.5 feet). The study cases were normalized by deleting extraneous work and assigning labor, equipment, and materials costs for the Southern California area in 1974. Detailed cost estimates (shown in Appendix A) were then made for the three tunnels for baselines.
  • The report covers: (1) general concepts: physical components of MHG facilities; site assessments, hydrology, maps, feasibility studies, engineering design, social aspects, economic aspects, detailed civil engineering, tendering, construction, etc.; (2) some ways of reducing capital costs in developing countries: penstocks, speed control, turbines and reverse pumps, voltage control devices, standardization of parts and reduction of equipment variety; (3) other cost reduction considerations.
  • The Arbuckle Mountain Hydroelectric Project is a Cooperative Agreement between the US Department of Energy (DOE) and Ron and Carlene Ott. The project's purpose is to build and intensively test an inexpensive American-made cross-flow turbine and to provide information to DOE on the cost, efficiency, operation and maintenance of the unit. This final report discusses the technical and financial aspects of planning, designing, manufacturing, and installing the turbine as well as design and construction details of the site.
  • A 7-day controlled flood was conducted in late March and early April of 1996 for research purposes. This short-duration high release was designed to rebuild high elevation sandbars, deposit nutrients, restore backwater channels, and provide some of the dynamics of a natural system. The goal was to test hypotheses about sediment movements and the response of aquatic and terrestial habitats to flood events. This report describes the resultant economic and financial impact of the test flow on the hydropower system. There were two sources of economic and financial impact associated with the beach/habitat-building test flow--changes in the timing and amountmore » of hydropower produced and the costs of the research. The purpose of this report is to describe the economic and financial impacts on the hydropower system.« less