Resonance Control System for the CEBAF Separator Upgrade
- Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States)
Abstract The Continuous Electron Beam Accelerator Facility (CEBAF) energy upgrade from 6 GeV to 12 GeV includes the installation of four new 748.5 MHz normal conducting deflecting cavities in the 5th pass extraction region. The RF system employs two digital LLRF systems controlling four normal conducting cavities in a vector sum setting. Cavity tune information of the individual cavities is obtained using a multiplexing scheme of the forward and reflected RF signals. Water skids equipped with heaters and valves are used to control resonance. A new FPGA-based hardware and EPICS-based predictive control algorithm has been developed to support reliable operation of the beam extraction process. This paper presents the architecture design of the existing hardware and software as well as a plan to develop a model predictive control system.
- Research Organization:
- Thomas Jefferson National Accelerator Facility, Newport News, VA (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC), Nuclear Physics (NP)
- DOE Contract Number:
- AC05-06OR23177
- OSTI ID:
- 1968420
- Report Number(s):
- JLAB-ACC-16-2457; DOE/OR/23177-5973
- Country of Publication:
- United States
- Language:
- English
Similar Records
LLRF System for the CEBAF Separator Upgrade
CEBAF NEW DIGITAL LLRF SYSTEM EXTENDED FUNCTIONALITY
Status of the CEBAF Energy Upgrade RF Control System
Conference
·
Sun Nov 30 23:00:00 EST 2014
·
OSTI ID:1189938
CEBAF NEW DIGITAL LLRF SYSTEM EXTENDED FUNCTIONALITY
Conference
·
Mon Jun 18 00:00:00 EDT 2007
·
OSTI ID:908791
Status of the CEBAF Energy Upgrade RF Control System
Conference
·
Fri Apr 01 00:00:00 EDT 2011
·
OSTI ID:1996919