Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Status of the CEBAF Energy Upgrade RF Control System

Conference ·
OSTI ID:1996919
To support the CEBAF energy upgrade from 6 GeV to 12 GeV, the RF control system is being modernized to control the high gradient high QL superconducting cavities. 80 new LLRF systems are being built to support the upgrade. The new system incorporates a heterodyne transceiver along with I&Q sampling to measure and control magnitude and phase. A low-cost Altera FPGA is used to digitally implement the cavity control algorithms. One of the features of the system is a digital self excited loop to track the cavity over large Lorentz detuning (800 Hz) during turn on. The system has successfully completed preliminary development and is now moving into the production stage of the project. This paper discusses the design, modeling, testing and production of the new RF control system and associated peripheral systems (cavity interlocks, and resonance control).
Research Organization:
Thomas Jefferson National Accelerator Facility, Newport News, VA (United States)
Sponsoring Organization:
USDOE Office of Science (SC), Nuclear Physics (NP)
DOE Contract Number:
AC05-06OR23177
OSTI ID:
1996919
Report Number(s):
JLAB-ACE-10-1254; DOE/OR/23177-1317
Country of Publication:
United States
Language:
English

Similar Records

CEBAF NEW DIGITAL LLRF SYSTEM EXTENDED FUNCTIONALITY
Conference · Mon Jun 18 00:00:00 EDT 2007 · OSTI ID:908791

RF System Modeling for the CEBAF Energy Upgrade
Conference · Fri May 01 00:00:00 EDT 2009 · OSTI ID:1021846

High Gradient Operation with the CEBAF Upgrade RF Control System
Conference · Wed Aug 16 00:00:00 EDT 2006 · OSTI ID:889367

Related Subjects