Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Gen 3 Particle Pilot Plant (G3P3) -- High-Temperature Particle System for Concentrating Solar Power (Phases 1 and 2)

Technical Report ·
DOI:https://doi.org/10.2172/1832285· OSTI ID:1832285
 [1];  [1];  [1];  [1];  [1];  [1];  [2];  [3];  [4];  [4];  [4]
  1. Sandia National Laboratories (SNL), Albuquerque, NM, and Livermore, CA (United States)
  2. Universidad Politécnica de Madrid (Spain)
  3. Electric Power Research Inst. (EPRI), Palo Alto, CA (United States)
  4. Australian National Univ., Canberra, ACT (Australia)

The U.S. Department of Energy Solar Energy Technologies Office initiated the Generation 3 Concentrating Solar Power (CSP) program to achieve higher operating temperatures (>700 °C) to enable next-generation CSP high-temperature power cycles such as the supercritical CO2 (sCO2) Brayton Cycle. Three teams were selected to pursue high-temperature gas, liquid, and solid pathways for the heat-transfer media. Phases 1 and 2, which lasted from 2018 – 2020, consisted of design, modeling, and testing activities to further de-risk each of the technologies and develop a design for construction, commissioning, and operation of a pilot-scale facility in Phase 3 (2021 – 2024). This report summarizes the activities in Phases 1 and 2 for the solid-particle pathway led by Sandia National Laboratories. In Phases 1 and 2, Sandia successfully de-risked key elements of the proposed Gen 3 Particle Pilot Plant (G3P3) by improving the design, operation, and performance of key particle component technologies including the receiver, storage bins, particle-to-sCO2 heat exchanger, particle lift, and data acquisition and controls. Modeling and testing of critical components have led to optimized designs that meet desired performance metrics. Detailed drawings, piping and instrumentation diagrams, and process flow diagrams were generated for the integrated system, and structural analyses of the assembled tower structure were performed to demonstrate compliance with relevant codes and standards. Instrumentation and control systems of key subsystems were also demonstrated. Together with Bridgers & Paxton, Bohannan Huston, and Sandia Facilities, we have completed a 100% G3P3 tower design package with stamped engineering drawings suitable for construction bid in Phase 3.

Research Organization:
Sandia National Laboratories (SNL-NM), Albuquerque, NM (United States)
Sponsoring Organization:
USDOE National Nuclear Security Administration (NNSA); USDOE Office of Energy Efficiency and Renewable Energy (EERE), Renewable Power Office. Solar Energy Technologies Office
Contributing Organization:
University of Adelaide; PROMES-CNRS; DLR; Bridgers & Paxton; Bohannan Huston; Solar Dynamics; Carbo Ceramics; Solex Thermal Science; Vacuum Process Engineering; Allied Mineral Products; Matrix PDM; Saudi Electricity Company; University of Texas at Austin
DOE Contract Number:
NA0003525
OSTI ID:
1832285
Report Number(s):
SAND2021-14614; 701739
Country of Publication:
United States
Language:
English

Similar Records

Gen 3 Particle Pilot Plant (G3P3) Life Cycle Management Plan (SAND report)
Technical Report · Thu Sep 01 00:00:00 EDT 2022 · OSTI ID:1886755

Cyclic Thermal and Structural Testing of a Hot Particle Storage Bin
Journal Article · Thu Dec 07 23:00:00 EST 2023 · SolarPACES Conference Proceedings · OSTI ID:2317709

Integrated Thermal Energy Storage and Brayton Cycle Equipment Demonstration (Integrated TESTBED) Project Design Basis
Conference · Wed Feb 28 23:00:00 EST 2024 · OSTI ID:2564982

Related Subjects