Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

The Spallation Neutron Source Normal Conducting Linac RF System Design for the Proton Power Upgrade Project

Conference ·
OSTI ID:1827032
The Proton Power Upgrade (PPU) project at the Spallation Neutron Source will double the available proton beam power from 1.4 to 2.8 MW by increasing the beam energy from 1.0 to 1.3 GeV and the beam current from 26 to 38 mA. The increase in beam current resulted in the need to redesign the existing normal conducting linac (NCL) RF Systems. High-power testing of the existing NCL RF Systems configured to accelerate PPU-level beam provided the data used to make the final design decisions. This paper describes the development and execution of those in-situ tests and the subsequent results.
Research Organization:
Oak Ridge National Laboratory (ORNL), Oak Ridge, TN (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
AC05-00OR22725
OSTI ID:
1827032
Country of Publication:
United States
Language:
English

Similar Records

Spallation Neutron Source Proton Power Upgrade (PPU) Project: Lessons Learned for CD-4
Technical Report · Tue Apr 01 00:00:00 EDT 2025 · OSTI ID:2573159

SNS proton power upgrade requirements for magnet and kicker systems
Conference · Thu Jun 01 00:00:00 EDT 2017 · OSTI ID:1439156

Spallation Neutron Source Proton Power Upgrade Low-Level RF Control System Development
Conference · Sun Aug 01 00:00:00 EDT 2021 · OSTI ID:1827030

Related Subjects