The SNS PPU project goals were to design, build, install and test the equipment necessary to double the accelerator power from 1.4 MW to 2.8 MW and to deliver a 2.0 MW qualified target. PPU also included the provision of a stub-out in the SNS accumulator-ring-to-target tunnel to facilitate a rapid connection to a new proton beamline for the Second Target Station (STS) project. The power capability was doubled by increasing the proton beam energy by 33% and the peak beam current by 50%, relative to pre-PPU accelerator performance. The project also included modifications to some buildings and services. The PPU project accomplished the energy upgrade by fabricating and installing new superconducting radiofrequency (RF) cryomodules, with supporting RF equipment, in the existing linac tunnel and klystron gallery, respectively. The High Voltage Converter Modulators (HVCM) and klystrons for some of the existing installed RF equipment were upgraded to handle the higher beam current. The increased beam power of 2 MW on the First Target Station (FTS) was enabled by the addition of a new high-volume gas injection system for pressure pulse and cavitation mitigation in the mercury target and a redesigned mercury target vessel.
Research Organization:
Oak Ridge National Laboratory (ORNL), Oak Ridge, TN (United States)
Sponsoring Organization:
USDOE Office of Science (SC), Basic Energy Sciences (BES)
DOE Contract Number:
AC05-00OR22725
OSTI ID:
2573159
Report Number(s):
ORNL/SPR--2025/3926; P01010100-LLN10000; R00
Country of Publication:
United States
Language:
English

Similar Records

Progress on the Proton Power Upgrade at the Spallation Neutron Source
Conference · Sun Aug 01 00:00:00 EDT 2021 · OSTI ID:1908092

Shielding Analyses for SNS Accelerator Power Upgrade
Conference · Thu Sep 01 00:00:00 EDT 2022 · OSTI ID:1971059

Progress towards the completion of the proton power upgrade project
Conference · Mon Jul 01 00:00:00 EDT 2024 · JACoW · OSTI ID:2477438

Related Subjects