Mechanisms Engineering Test Loop (METL) Operations and Testing Report - FY2019
- Argonne National Lab. (ANL), Argonne, IL (United States)
This report documents the operations and testing that was performed at the Mechanisms Engineering Test Loop (METL) during FY2019. The METL facility had a very successful initial year of operations having logged over 365 days of operations with molten sodium either flowing or static. FY2019 saw the commissioning, insertion, and extraction of the first test assembly in METL. In addition, METL is being prepared to support a second experiment, a thermal hydraulic experiment, called Thermal Hydraulic Experimental Test Article (THETA).
- Research Organization:
- Argonne National Laboratory (ANL), Argonne, IL (United States)
- Sponsoring Organization:
- USDOE Office of Nuclear Energy (NE), Office of Nuclear Reactor Technologies. Advanced Reactor Technologies (ART)
- DOE Contract Number:
- AC02-06CH11357
- OSTI ID:
- 1804742
- Report Number(s):
- ANL-METL-21; ANL-ART-179; 157280
- Country of Publication:
- United States
- Language:
- English
Similar Records
Mechanisms Engineering Test Loop (METL) Operations and Testing Report (FY2020)
Mechanisms Engineering Test Loop (METL) Operations and Testing Report (FY2021)
Mechanisms Engineering Test Loop (METL) Operations and Testing Report (FY2022)
Technical Report
·
Tue Sep 01 00:00:00 EDT 2020
·
OSTI ID:1698024
Mechanisms Engineering Test Loop (METL) Operations and Testing Report (FY2021)
Technical Report
·
Wed Sep 01 00:00:00 EDT 2021
·
OSTI ID:1841681
Mechanisms Engineering Test Loop (METL) Operations and Testing Report (FY2022)
Technical Report
·
Thu Sep 01 00:00:00 EDT 2022
·
OSTI ID:1906375