Mechanisms Engineering Test Loop (METL) Operations and Testing Report (FY2020)
- Argonne National Lab. (ANL), Argonne, IL (United States)
This report documents the operations and testing that was performed at the Mechanisms Engineering Test Loop (METL) during FY2020. The METL facility had a very successful second year of operations having logged over 730 days (as of September 19, 2020) of operations with molten sodium either flowing or static. The METL piping and vessel system was filled with sodium on September 19, 2018 after a successful transfer of sodium from fifteen 55-gallon drums. FY2020 saw the successful reconditioning and insertion of the Gear Test Assembly (GTA) for its second round of testing, the full use of the 18-inch Flexi-Cask system, the second extraction of the GTA from METL, and the removal of sodium from the GTA test article by the carbonation process followed by an alcohol wash. In addition, METL is being prepared to support a second larger experiment, a thermal hydraulic experiment, called Thermal Hydraulic Experimental Test Article (THETA).
- Research Organization:
- Argonne National Laboratory (ANL), Argonne, IL (United States)
- Sponsoring Organization:
- USDOE Office of Nuclear Energy (NE)
- DOE Contract Number:
- AC02-06CH11357
- OSTI ID:
- 1698024
- Report Number(s):
- ANL-ART--210; 162638
- Country of Publication:
- United States
- Language:
- English
Similar Records
Mechanisms Engineering Test Loop (METL) Operations and Testing Report (FY2021)
Mechanisms Engineering Test Loop (METL) Operations, Maintenance, and Testing - FY2025
Mechanisms Engineering Test Loop (METL) Operations and Testing Report - FY2019
Technical Report
·
Wed Sep 01 00:00:00 EDT 2021
·
OSTI ID:1841681
Mechanisms Engineering Test Loop (METL) Operations, Maintenance, and Testing - FY2025
Technical Report
·
Tue Dec 31 23:00:00 EST 2024
·
OSTI ID:3001480
Mechanisms Engineering Test Loop (METL) Operations and Testing Report - FY2019
Technical Report
·
Sun Sep 01 00:00:00 EDT 2019
·
OSTI ID:1804742