Protective system issues during restoration
Journal Article
·
· IEEE Transactions on Power Systems
- IRD Corp., Bethesda, MD (United States)
- Baltimore Gas and Electric Co., MD (United States)
This paper is one of a series presented on behalf of the System Operation Subcommittee with the intent of focusing industry attention on power system restoration issues. Performance of protective systems may be measured by the relative percentages of correct and appropriate relay operations, correct but inappropriate operations, wrong tripping, and failure to trip. The primary reason for correct but inappropriate operations is attributed to the power system changes. During restoration, the power system undergoes continual changes and therefore it is subject to ``correct but inappropriate`` relay operations.
- OSTI ID:
- 163047
- Report Number(s):
- CONF-950103--
- Journal Information:
- IEEE Transactions on Power Systems, Journal Name: IEEE Transactions on Power Systems Journal Issue: 3 Vol. 10; ISSN 0885-8950; ISSN ITPSEG
- Country of Publication:
- United States
- Language:
- English
Similar Records
Nuclear plant requirements during power system restoration
Overvoltage control during restoration
Special considerations in power system restoration
Journal Article
·
Tue Aug 01 00:00:00 EDT 1995
· IEEE Transactions on Power Systems
·
OSTI ID:163046
Overvoltage control during restoration
Journal Article
·
Sat Oct 31 23:00:00 EST 1992
· IEEE Transactions on Power Systems (Institute of Electrical and Electronics Engineers); (United States)
·
OSTI ID:6862248
Special considerations in power system restoration
Journal Article
·
Sat Oct 31 23:00:00 EST 1992
· IEEE Transactions on Power Systems (Institute of Electrical and Electronics Engineers); (United States)
·
OSTI ID:6977262