Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

RECENT RESULTS AND OPPORTUNITIES AT THE IOTA FACILITY

Conference ·
OSTI ID:1614724
The Integrable Optics Test Accelerator (IOTA) was recently commissioned as part of the Fermilab Accelerator Science and Technology (FAST) facility. The IOTA ring was briefly operated with electrons at 47 MeV followed by a 6-months run with 100 MeV electrons. The main goal of the first runwas to study beam dynamics in the integrable lattices with elliptical nonlinear magnets and in the quasi-integrable case with profiled octupole channel. The flexibility of the IOTA ring allowed a wide range of complementary studies, such as experiments with a single electron; studies of fluctuations in undulator radiation and operation with low emittance beams. Over the next year the proton injector will be installed and two runs carried out. One run will be dedicated to the refinement of nonlinear experiments and another will be dedicated to the proof-of-principle demonstration of Optical Stochastic Cooling.
Research Organization:
Fermi National Accelerator Laboratory (FNAL), Batavia, IL (United States)
Sponsoring Organization:
USDOE Office of Science (SC), High Energy Physics (HEP) (SC-25)
Contributing Organization:
IOTA
DOE Contract Number:
AC02-07CH11359
OSTI ID:
1614724
Report Number(s):
FERMILAB-CONF-19-675-AD; oai:inspirehep.net:1790794
Country of Publication:
United States
Language:
English

Similar Records

Overview of the New Beam Physics Research at the IOTA/FAST Facility
Conference · Tue Jul 09 00:00:00 EDT 2024 · OSTI ID:2397315

Validating pyORBIT for Modeling Beam Dynamics in the IOTA Ring
Conference · Tue Aug 10 00:00:00 EDT 2021 · OSTI ID:1832786

Characterization of Octuopole Elements for IOTA
Conference · Mon Aug 29 00:00:00 EDT 2022 · OSTI ID:1885037

Related Subjects