Deep water X-mas tree standardization -- Interchangeability approach
Conference
·
OSTI ID:160664
- Petrobras, Rio de Janeiro (Brazil)
Aiming the rationalization of subsea operations to turn the production of oil and gas more economical and reliable, standardization of subsea equipment interfaces is a tool that can play a very important role. Continuing the program initiated some years ago, Petrobras is now harvesting the results from the first efforts. Diverless guidelineless subsea Christmas trees from four different suppliers have already been manufactured in accordance to the standardized specification. Tests performed this year in Macae (Campos Basin onshore base), in Brazil, confirmed the interchangeability among subsea Christmas trees, tubing hangers, adapter bases and flowline hubs of different manufacturers. This interchangeability, associated with the use of proven techniques, results in operational flexibility, savings in rig time and reduction in production losses during workovers. By now, 33 complete sets of subsea Christmas trees have already been delivered and successfully tested. Other 28 sets are still being manufactured by the four local suppliers. For the next five years, more than a hundred of these trees will be required for the exploration of the new discoveries. This paper describes the standardized equipment, the role of the operator in an integrated way of working with the manufacturers on the standardization activities, the importance of a frank information flow through the involved companies and how a simple manufacturing philosophy, with the use of construction jigs, has proved to work satisfactorily.
- OSTI ID:
- 160664
- Report Number(s):
- CONF-950501--
- Country of Publication:
- United States
- Language:
- English
Similar Records
New design of a guidelineless horizontal tree for deepwater ESP wells
New concept in subsea completions: diverless flowline connection; single-trip, guidelineless workover
Standardized wellheads proven economical for subsea operations
Conference
·
Mon Dec 30 23:00:00 EST 1996
·
OSTI ID:433923
New concept in subsea completions: diverless flowline connection; single-trip, guidelineless workover
Journal Article
·
Mon Aug 01 00:00:00 EDT 1977
· Ocean Ind.; (United States)
·
OSTI ID:7219304
Standardized wellheads proven economical for subsea operations
Journal Article
·
Mon May 02 00:00:00 EDT 1994
· Oil and Gas Journal; (United States)
·
OSTI ID:7173783