IDC Reengineering Phase 2 & 3 Cost Estimate Summary (Version 1.0.1)
- Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)
Sandia National Laboratories has prepared a cost estimate budgetary planning for the IDC Reengineering Phase 2 & 3 effort. This report provides the cost estimate and describes the methodology, assumptions, and cost model details used to create the cost estimate.
- Research Organization:
- Sandia National Laboratories (SNL-NM), Albuquerque, NM (United States)
- Sponsoring Organization:
- USDOE National Nuclear Security Administration (NNSA)
- DOE Contract Number:
- AC04-94AL85000
- OSTI ID:
- 1531331
- Report Number(s):
- SAND--2014-18065R; 670323
- Country of Publication:
- United States
- Language:
- English
Similar Records
IDC Reengineering Phase 2 & 3 Project Scope
IDC Re-Engineering Phase 3 Budgetary Cost Estimate Summary (Leveraged NDC Case)
IDC reengineering Phase 2 & 3 US industry standard cost estimate summary
Technical Report
·
Wed Oct 01 00:00:00 EDT 2014
·
OSTI ID:1172791
IDC Re-Engineering Phase 3 Budgetary Cost Estimate Summary (Leveraged NDC Case)
Technical Report
·
Sat Dec 31 23:00:00 EST 2016
·
OSTI ID:1494177
IDC reengineering Phase 2 & 3 US industry standard cost estimate summary
Technical Report
·
Wed Dec 31 23:00:00 EST 2014
·
OSTI ID:1167409